WIPs
I’m almost to the heel on these. Once I get past the heel- I’ll have about an inch of ribbing, and then I’m done.
2. Washcloths
One and a half more to knit!
3. DC Frankenmonster KAL
Week Three is body and head, so I can finally get going (I like to attach limbs as I go).
So the arms are:
-No stripes
-Different arms
-SIX different arms
And the feet are:
2 different, new colored legs.
And now the body and head:
I rolled DOUBLE FOURS, so I get body and head from the same pattern, PLUS double heads!
Wow- six arms, different legs, and two heads. This monster is going to be FABULOUS!!!
I am seeing socks everywhere on the knitting blogs this morning. There must be something in the air (AKA lack of sunshine!). Happy knitting. Lucky Hubby.